The owners of this plaza in Hialeah needed a general contractor with commercial construction experience after receiving numerous complaints from tenants and their clients about substantial flooding. The flooding was due to improper drainage in the parking lot from collapsed sewer lines. The issue was so bad that it began to affect business for the business owners in the plaza because customers were going elsewhere to avoid the nightmare of parking in the plaza.
After receiving the run-around from other contractors, the plaza owners contacted Rausa Builders Corp for their commercial construction needs and redo the entire parking lot. The cause of the drainage issue was collapsed underground sewer lines requiring replacement of all lines, catch basins & French drains. The project was spilt into 3 phases so customers always had a place to park during the construction process. As a result, the plaza owners, their tenants and their customers had ample parking with proper drainage, sprinklers for irrigation and required signage.
Leave a Reply